First base slab cast at underground bullet train station of BKC Mumbai News
The first concrete foundation slab of the Mumbai underground bullet train station was cast on November 30, 2024 at a depth of about 32 meters from ground level, equivalent to a 10-storey building. The station is going to be built using the bottom-up method, that is, excavation from the ground level and paving work has … Read more